Dear CCL,
Two things are happening soon... I will be in travel since tomorrow
for 10 days. But this is usually not a big problem since I can
manage most of the CCL tasks from the hotel.
The real problem is that I need to upgrade my electrical service
in my home. And this will require that electricity is disconnected,
new fuse box and meter box is installed, the inspectors come and
see that things are done properly, and then the power company electrician
comes and attaches the power and then someone needs to "push the
buttons and pray". This is scheduled for the mid week and should
not be longer than a day, but, as we all know, the "s... happens".
Obviously, I do not want for this to take more time than absolutely
needed. Not only because of CCL, but also because I do not want the
food in my freezer and fridge to get a second life...
So... Do not be surprised when www.ccl.net -- server not responding.
Best for all of you, and keep your fingers crossed...
Jan