CCL: CCL.NET Scheduled Outage



 Sent to CCL by: Jan Labanowski [janl__speakeasy.net]
 Dear CCL,
 Two things are happening soon... I will be in travel since tomorrow
 for 10 days. But this is usually not a big problem since I can
 manage most of the CCL tasks from the hotel.
 The real problem is that I need to upgrade my electrical service
 in my home. And this will require that electricity is disconnected,
 new fuse box and meter box is installed, the inspectors come and
 see that things are done properly, and then the power company electrician
 comes and attaches the power and then someone needs to "push the
 buttons and pray". This is scheduled for the mid week and should
 not be longer than a day, but, as we all know, the "s... happens".
 Obviously, I do not want for this to take more time than absolutely
 needed. Not only because of CCL, but also because I do not want the
 food in my freezer and fridge to get a second life...
 So... Do not be surprised when www.ccl.net -- server not responding.
 Best for all of you, and keep your fingers crossed...
 Jan